Renovations: 2017-Heat pump and furnace 2009- Roof 2015-Swimming pool (15 x 30 feet): new canvas and filter 2015-Bathroom: renovated shower 2014-Renovated master bathroom: marble floor/countertop, cabinets 2014-Laundry room: cabinets, quartz countertop above washer/dryer, large utility sink 2014-Bathroom: cabinets, quartz countertop, ogees 2007- Kitchen and family room completely redone: wood cabinets, quartz countertops, ogees, flooring, fireplace, French door 2003-Paving stones 2011-Wood floor on the ground floor and 2nd floor 2022- 2 bathrooms redone 2020- Fence of the left side with the Neighbor 2024-Basement, all the floor redone